Production and supply incinerator
 

Waste Incinerator Delivery Date

From: FAQ | Date:2024/12/11 | Hit:
Delivery Date of the Waste Incinerator
 
The magnetic carbonization waste pyrolysis unit (waste incinerator) undergoes one inspection from steel plate warehousing to welding and assembly.
 
It is then sent to the powder coating workshop for a second inspection of the exterior coating.
 
In the final assembly workshop, electrical installation and parts configuration are completed, followed by three inspections before final packaging and shipping.
 
The entire process takes 1-2 months. We only have ordering channels; we do not have stock on hand.

 